| S.No | Project | Duration In Years | Cost in crores |
| 1 | Improvement such as providing two lane flexible carriageway for Jeypore- Kota- Malkangiri Road (NH-326) from Km. 327/700 Km. to 413/700 Km. (Old chainage Km. 16/000 to Km. 102/000 (SH-25) under Vijayawada Ranchi Corridor. | 2 years | 215 |
| 2 | Widening to two lane with paved shoulders from km 59.500 to km 132.300 of Manneguda- Ruvulapally section NH 163 on EPC Mode under NH(O) in the state of Telangana. | 2 years | 250 |
| 3 | Rehabilitation and upgradation of NH 326A from km 0/0 to 41/979 (excluding km 2/255 to 3/372 and km 36/820 to 38/275) to two lane with paved Shoulders in the State of Andhra Pradesh under NH(O) on EPC Mode. | 2 years | 174 |
| 4 | Rehabilitation and upgradation of new NH-544DD from design Chainage Km 56.00 to 102.20 of Kalyandurg-Molakalmuru section to two lane with paved shoulders in the State of Andhra Pradesh under NH(O) on EPC mode. | 2 years | 218 |
| 5 | Rehabilitation and upgradation of NH42 from Km 76/0 to 102/130 (Design Chainage 76/00 to 99/971 excluding Km 77/3 to 78/350 ( Rapthadu – Bathapalli Section) to four lane in the state of Andhra Pradesh under corridor approach through EPC basis contract under NH(O). | 1.5 years | 193 |
| 6 | Construction of Two lane ROB and its Approaches in lieu of KM 33/100 ( Railway Ch. 730/11-13) on NH 326A in the state of AP under NH(O) through EPC | 2 years | 41.90 |
| 7 | Construction of Two lane ROB and its Approaches in lieu of KM 2/100 ( Railway Ch. 33/900-1000) on NH 326A in the state of AP under NH(O) through EPC. | 2 years | 42.43 |
| 8 | Construction of Roads works in BARC Campus at Atchutapuram, manadal, Vishakhapatnam. | 1 year | 10.18 |
| 9 | Widening to 2-lane with paved shoulder including geometric improvement from Km 397/00 to Km 422/00 (25 (Km) (Design Km 388/650 to Km 410/439) (21.789 Km) on Churaibari - Agarthala section Nh-44 in the State of Tripura on EPC mode under NH(O). | 2 years | 101.94 |
| 10 | Widening and strengthening of existing intermediate lane/two lane to two lane with paved shoulders from Km 678+555 to km 699+655 of Nirmal to Khanapur section of NH -61 /extended in the state of Telangana under NH(O) on EPC mode. | 2 years | 99.99 |
| 11 | Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4A) of Imphal-Kohima Road (NH-39) (Design Chainage from Km 262+175 to Km 274+610) in the state of Manipur on EPC Mode. | 1.6 years | 212.54 |
| 12 | Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal-Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on EPC Mode. | 1.6 years | 137.07 |
| 13 | R&B Department - NDM Widening and Strengthening of (1) Rayachoty to Vempalli Road from Km 15.600 to 25.300 (Design Chainage Km 15.600 to 25.225) (SH - 55)(2) Pulivendala to Parnapalli Road from Km 35.600 to 38.105(Design Chainage) : Km 35.600 to 38.105) (SH 343) (3) Kadapa - Porumamilla Road from KMm 4.200 to 11.000 (Design Chainage: Km 4.200 to 11.000)(SH - 56) (4) Porumamilla - Kondrajupalli- Narasapuram- Kasinayanapalli Road from Km 0.000 to 12.000(Design Chainage Km 0.000 to 12.000) (SH - 43) (5) Chinna Mandem - Sambepalli -T Sundepalli Road From 0.000 to 9.280 (Design Chainage from Km 0.000 to 9.280) (SH - 389) (6) Rajampeta - Kadiri - Thummukur Road from Km 29.600 to Km 45.600 (Design Chainage Km 29.600 to 45.420) (SH- 59) (7) Rayachoti-T Sundapalli - Pincha Road from Km 0.000 to 20.180 (Design Chainage Km 0.000 to 20.180) (SH - 387) and (8) Nimmanapalli - Vayalpad Gurramkonda Galiveedu Road from Km 25.800 to 31.700 (SH-66) in YSR Kadapa District District taken up Under Andhra Pradesh Roads and Bridges Reconstruction Project (APRBRP) | 2 years | 121.63 |